您的浏览器版本太低,将不能正常浏览。请升级 Internet Explorer或使用Google Chrome浏览器。
如果您在使用双核浏览器,请切换到高速 / 极速 / 神速 核心。
Company News
2019-05-24
Browse
1. The basic situation of the construction project
Project Name: Chenjiapo Farm Project
Nature of the project: New
Construction address: Southeast of Chenjiapozi Village, Yingqiu Town, Changle County
Project investment: a total investment of 10 million yuan
Construction content: The project covers an area of ​​37,490 square meters, builds 10 standard chicken houses of 94.5 meters × 16.5 meters and related supporting facilities, and the breeding area reaches 15592.5 square meters. After the project is completed, 300,000 broilers will be formed annually and broilers will be released annually. 1.8 million capacity
2. The generation, prevention and discharge of pollutants
1. Wastewater
The chicken house washing wastewater and domestic sewage generated by the project will enter the sewage treatment station of the site for centralized treatment, and will be used for irrigation of surrounding farmers after treatment, and will not be discharged.
Therefore, the wastewater generated by this project has little impact on the surrounding water bodies.
2. Exhaust gas
The air pollutants generated during the project operation are mainly foul odor gases generated in chicken houses, sewage treatment stations, etc. during the breeding process, and exhaust gases generated by transportation vehicles. The malodorous gas generated in the sewage treatment station is discharged through the activated carbon adsorption deodorization process, and is discharged through a 15m high exhaust cylinder after being purified by the activated carbon adsorption device; the duckhouse malodorous gas is improved through reasonable layout, control of feeding density, enhanced ventilation, and the addition of additives to the feed to enhance greening, Spray deodorant to prevent secondary pollution; internal and external transportation of the project will generate a certain amount of dust and automobile exhaust. After taking measures such as slowing down, hardening the road, spraying water to suppress dust, and planting green belts on both sides of the road, the amount produced can be To a minimum.
3. Noise
The noise source of this project is mainly production equipment. After taking certain noise reduction measures, it can meet the requirements of Class 2 standards of "Environmental Noise Emission Standards for Industrial Enterprises at the Boundary" (GB12348-2008).
4. Solid waste
The solid wastes in this project mainly come from chicken manure, scattered feathers, feed residues, sick and dead chickens, epidemic prevention and other medical wastes, waste activated carbon, sewage treatment sludge and domestic garbage. Among them, chicken manure and scattered feathers and feed residues are collected and sold for sale after the end of the breeding cycle; sick and dead chickens are collected and treated by a harmless treatment plant; and the medical waste generated by the project is temporarily stored after collection. In the temporary storage room, the hazardous waste treatment qualified units shall conduct regular centralized disposal; the waste activated carbon replaced by the sewage treatment station shall be directly recovered by the manufacturer; the sludge and domestic garbage generated by the project sewage treatment station shall be collected and transported by the sanitation department periodically after collection. Therefore, all solid wastes are effectively disposed of and not discharged externally.
3. Network link for the full text of the environmental impact report soliciting opinions and the ways and means of consulting the paper report
The web link of the full text of the environmental impact report (draft for soliciting opinions) is: http://www./2019/1558667918d183149.html; the public can also borrow the environmental impact report of this project by contacting the construction unit or the environmental assessment unit (solicitation) Comment draft).
4. The public scope for comments
It is mainly for residents and other stakeholders in the area around the project site (North Shenmingting Village, Yaojiapozi, Fujiapozi Village, Chenjiapozi Village).
V. Internet link to the public comment form
The public can use the following website
(Http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html) Obtain the public comment form.
6. Ways and means of public opinion
The public can submit opinions or consult relevant situations to the construction unit or EIA unit by telephone, letter, email or directly to the work unit. Contact as below:
Construction unit: Weifang Xinhesheng Poultry Co., Ltd.
Contact address: Southeast of Chenjiapozi Village, Yingqiu Town, Changle County
Contact: Wang Feng
Telephone: 13869688809
Email: wangfeng369369@163.com
7. The starting and ending time of public comments
10 working days from the date of publicity, from May 24 to June 06, 2019.
                                                                                                  
 
 
                                                                                                               Publicity unit: Weifang Xinhesheng Poultry Co., Ltd.
                                                                                                                            Release Date: 2019.05.24